C市10万吨天污水处理厂扩大初步设计毕业论文

 2022-01-27 15:16:13  

论文总字数:31537字

摘 要

根据资料,乙市截至2017年底有城市人口15万,根据人口规划,远期城市人口控制在25万,生活污水定额为190 L/(cap∙d),工业污水量为85000 m3/d。本设计方案中污水厂每日拟处理污水量为10万吨。为了保障水体水质质量,实现污水的资源化及回收利用的价值,并结合全国污水处理厂发展趋向,对污水厂出厂水水质的要求不断提高。由污水处理厂接受到的水体,最终出水水质要求为《城镇污水处理厂污染物排放标准》(GB18918-2002)一级A标准。

本设计二级处理工艺采用A2/O工艺法,因出水水质要达到一级A标准,所以设置三级处理工艺,采用机械澄清池处理。工艺不复杂,脱氮除磷效果好。

污水进入污水厂,采用粗格栅过滤器,通过提升泵至细格栅,过滤进入曝气砂室,将相对密度较大的无机颗粒移至径向流沉淀池,污水介质中的悬浮固体增加沉淀分离。进入厌氧池,在各种厌氧菌作用下,废水先被处理。然后废水进入缺氧池。在反硝化细菌作用下,废水进一步被处理。然后废水进入好氧池,经沉淀,水与高磷污泥分离,达到除磷效果。其次,通过径向流沉降槽进行二次沉淀法分离污泥,将活性污泥进行澄清、浓缩并由混合料返回。之后,机械澄清池进行三级处理。最后,采用氯化间质灭菌池进行最终消毒处理,以杀灭处理过的污水中的病原微生物。

污泥处理部分中,经污泥回流井,回流污泥与剩余污泥进入贮泥池,污泥浓缩脱水,压成泥饼并达到含水率要求后运出厂外。

关键词:城镇污水 A2/O工艺 污水处理厂

C city sewage treatment plant expanded preliminary design

Abstract

According to the data, by the end of 2017, city b had a population of 150,000. According to the population planning, the long-term urban population was controlled at 250,000, the domestic sewage quota was 190 L/(cap. D), and the industrial sewage volume was 85,000 m3/d. In this design scheme, the sewage treatment capacity of the sewage plant is 100,000 tons per day. In order to ensure the quality of water quality, realize the value of waste water resource utilization and recycling, and combine with the development trend of national sewage treatment plants, the requirements on the quality of water produced by sewage plants are constantly improved. The final effluent water quality requirement of the water body accepted by the sewage treatment plant is grade A standard of pollutant discharge standard of urban sewage treatment plant (gb18918-2002).

The secondary treatment process of this design adopts A2/O process method. Since the effluent water quality should meet the first level A standard, the tertiary treatment process is set up and the treatment is carried out by mechanical clarification tank. The technology is not complicated and the effect of nitrogen removal and phosphorus removal is good.Sewage into the sewage plant, the use of coarse grating filter, pump through ascension to the fine screen, filter into the aerated grit chamber, relative density larger inorganic particles will be moved to the radial flow sedimentation tank, sewage medium increased suspended solid precipitation separation. Enter anaerobic pond, in the action of all kinds of anaerobic bacteria, wastewater is first treated. The waste water then enters the anoxic pool. Wastewater is further treated under the action of denitrifying bacteria. Then the waste water enters the aerobic pond and is separated from the high phosphorus sludge by precipitation. Secondly, the activated sludge is clarified, concentrated and returned by the mixture through secondary sedimentation by radial flow sedimentation tank. After that, the mechanical clarification tank was treated in three stages. Finally, the chlorinated interstitial sterilization tank was used for final disinfection treatment to kill pathogenic microorganisms in treated sewage.

In the sludge treatment part, the sludge will enter the sludge storage pond through the sludge return well, and the sludge will be condensed and dehydrated, pressed into mud cake and transported out of the factory after reaching the water content requirement.

Key words: urban sewage; A2/O process; sewage treatment plant

目 录

摘要 I

ABSTRACT II

第一章 设计及分析 2

1.1设计任务及资料分析 2

1.1.1设计目的 2

1.1.2 设计任务与要求 2

1.1.3设计内容 2

1.2设计规模 2

1.3 城市自然状况 2

1.4设计水量及水质 2

1.4.1设计水量 2

1.4.2设计出水及去除率 3

1.5设计原则 3

第二章 方案与构筑物比选 5

2.1污水处理工艺选择 5

2.1.1工艺方案分析 5

2.1.2工艺流程图 5

2.2.1格栅 5

2.2.2沉砂池 6

2.2.3初沉池 6

2.2.4 A2/O工艺生化池 6

2.2.5二沉池 6

2.2.6机械加速澄清池 6

2.2.7消毒池 7

2.2.8污泥处理构筑物 7

第三章 污水处理设计计算 8

3.1 格栅 8

3.1.1设计参数 8

3.1.2粗格栅 8

3.1.3细格栅 10

3.2提升泵 11

3.2.1泵房形式及工艺布置 12

3.2.2泵房设计计算 12

3.3 沉砂池 12

3.3.1设计计算 13

3.4 初沉池 15

3.4.1设计计算 15

3.5 A2/O生化反应池 17

3.5.1设计参数 18

3.5.2设计参数计算 18

3.5.3 A2/O曝气池计算 19

3.5.4反应池进、出水系统计算 21

3.5.5反应池回流系统计算 24

3.5.6 A2/O工艺需氧量设计 25

3.5.7曝气器数量计算 27

3.5.8空气管路计算 28

3.6二沉池 28

3.6.1设计计算 29

3.7机械加速澄清池 32

3.7.1机械搅拌澄清池池体部分的计算 33

3.8.消毒池 40

3.8.1加氯量计算 40

3.8.2加氯设备 40

3.8.3平流式消毒接触池 40

3.8.4出水计算 41

第四章 污泥处理构筑物的设计计算 42

4.1贮泥浓缩设计计算 42

4.1.1集泥池计算 42

4.1.2污泥浓缩池 43

4.1.3贮泥池 47

4.2消化池 48

4.2.1一级消化池容积计算 48

4.2.2二级消化池容积计算 50

4.3污泥脱水 51

4.3.1设计参数及原则 51

4.3.2脱水后污泥量 52

4.3.3.脱水机型号的选择 52

第五章 污水处理厂总体布置 54

5.1平面布置 54

5.2高程布置 54

5.2.1 污水通过各处理构筑物之间的水头损失值 55

5.2.2污水流经量水设备的水头损失应考虑以下事项 55

5.2.3 污水与污泥高程计算 55

参考文献 58

致 谢 59

第一章 设计及分析

1.1设计任务及资料分析

1.1.1设计目的

毕业设计是我们在大学里最后一个重要的任务,就是把大学四年里所学到的知识结合到一起,然后运用起来,让我们能在以后的工作中能解决问题。在这大学四年里,我们学习到了环境工程原理、水污染控制与资源化、固体废物与资源化、工业水处理、大气污染控制工程、环境化工原理实验、工业微生物学、无机化学、有机化学、分析化学、物理化学、高分子化学、生物炼制、高分子材料、生物质材料及应用、天然产物化学等许多专业知识,但是我们还并未能将这些知识结合运用起来,所以有了这次的毕业设计,通过设计,我们能将这些知识结合起来,并且能够灵活运用到实际设计,并且通过设计,还能更加深刻的理解了这些专业知识,让我们在将来能够更好的运用。

1.1.2 设计任务与要求

完成某城镇污水处理厂工艺设计;书写详细的设计说明书和计算书。