无人纯电动物流车驱动桥设计开题报告
2020-02-18 19:35:26
1. 研究目的与意义(文献综述)
Ⅰ. the purpose and significance of project
2. 研究的基本内容与方案
ii. basic contents, objectives, technical schemes and measures to be adopted
3. 研究计划与安排
Ⅲ. Schedule
time | Work content | submission |
Semester 7,week 19-20 | Graduation design mobilization, selection of graduation design topics, graduation design task book (relevant parameters), in-school data collection | Graduation design task book |
Semester 8,week 1 | Plan conception, literature retrieval, completion of thesis proposal | literature retrieval, thesis proposal |
Semester 8,week 2-3 | Out-of-school internship, out-of-school data collection, completion of practice report | Internship report |
Semester 8, week 4 | Translation, re-collection of information | Translation |
Semester 8, week 5-7 | Design calculation, sketch sketch | Design calculation, sketch sketch |
Weekends of week 7 | Interim reply |
|
Semester 8, week 8-10 | Pattern drawing, writing design calculation instruction book(paper), pre-reply | Patterns,the first draft of paper |
Semester 8, week 11-13 | Collation of patterns and instruction book, arrangement of information kits, examination of reply qualification | Formal patterns and paper |
Semester 8, week 14 | Apply for reply and preparation;tutor reviews patterns and instruction books | Graduation design reference kit |
Semester 8, week 15-16 | Reply and recommend the excellent | Graduation design grade, provincial excellent graduation thesis |
4. 参考文献(12篇以上)
Ⅳ、reference
[1] sijian mo. analysis on the current situation and trend of the development of commercial vehicle bridges in china[j]. equipment manufacturing technology, 2005,(1):37.