某铁矿3000m2废石堆坡面复垦工艺设计毕业论文

 2021-11-02 20:54:02  

摘 要

根据《土地复垦条例》对复垦事业制度化、规范化和法制化的要求,以及国土资源提出的制定和完善矿区土地复垦动态检测的标准需要,本设计以大冶某铁矿山为例,从矿山的研究出发,结合矿区土地利用分类特点,在进行了资料收集之后,综合考虑各项行业规范,采用客土复垦工艺,选择改良土壤,通过比较各类覆土工艺优缺点,选择合适覆土厚度及工艺,添加土壤改良剂,优化植被种类和配比,优化覆土喷播方式,达到植绿同时景观效应好,经济效益高。

废石堆是矿山开采遗留的大块固体,长期堆积会形成废石堆污染,其中含有有害物质,会形成酸雨、放射性等危害,造成空气污染、破坏环境和占压农地等危害。大冶铁矿山在长期开采过程中堆积了不少废石堆,其长期堆积造成了严重的不良影响,大量土地资源被浪费,环境受到污染。主要的研究结果如下:

  1. 确定当地废石堆条件,引入客土复垦工艺。
  2. 学习研究土地复垦标准体系、复垦监管体系。
  3. 通过对矿区表面特性和废石堆场特性,结合当地城市概况、地理位置、地质地貌、气象条件、社会经济条件等因素综合分析,对铁矿山废石堆场采取优化土壤性质、覆土处理,根据数据分析及相关资料,设计选定了林地、草牧地的复垦方向;进行了土地适宜性评价和可行分析;覆土厚度选择为10 cm,通过施工工艺比选确定了客土喷播工艺。
  4. 完成工艺设计说明书,绘制工艺图和效果图。

关键词:土地资源;客土复垦;改良剂;客土喷播;覆土厚度

Abstract

According to the requirements of the "Regulations on Land Reclamation" for the institutionalization, standardization and legalization of reclamation, As well as the requirements of establishing and perfecting the standards for dynamic detection of land reclamation in mining areas put forward by land and resources, This design takes an iron mine in Daye as an example, Starting from the study of mines, According to the characteristics of land use classification in mining area, After collecting data, considering various industry standards comprehensively, adopting foreign soil reclamation technology, selecting improved soil, comparing the advantages and disadvantages of various soil covering technologies, selecting appropriate soil covering thickness and technology, adding soil conditioner, optimizing vegetation types and proportions, and optimizing soil covering spray sowing methods, so as to achieve good landscape effect and high economic benefits while planting green.

Waste rock pile is a large solid left over from mining. Long-term accumulation will form waste rock pile pollution, which contains harmful substances and will form hazards such as acid rain and radioactivity, causing air pollution, environmental damage and occupation of agricultural land. Daye Iron Mine has accumulated a lot of waste rock piles in the long-term mining process, which has caused serious adverse effects. A large amount of land resources have been wasted and the environment has been polluted. The main research results are as follows:

  1. Determine the local waste rock pile conditions and introduce foreign soil reclamation technology.

(2) Study and study the land reclamation standard system and reclamation supervision system.

(3) Based on the comprehensive analysis of the surface characteristics of the mining area and the characteristics of the waste rock storage yard, combined with the general situation of the local city, geographical location, geological and geomorphological conditions, meteorological conditions, social and economic conditions and other factors, the waste rock storage yard of the iron mine is optimized in soil properties and covered with soil. According to the data analysis and relevant data, the reclamation direction of forest land and grass grazing land is designed and selected. Land suitability evaluation and feasibility analysis were carried out. The thickness of covering soil is 10 cm, and the spray sowing technology of foreign soil is determined through comparison and selection of construction technologies.

(4) Complete the process design specification and draw the process drawing and effect drawing.

Key words:Land resources; Reclamation of foreign soil; Modifier; Spraying and sowing on foreign soil; Covering soil thickness

目录

摘要..................................................................................................................................................I

第一章 绪论 1

1.1 设计背景与意义 1

1.2矿区土地复垦和生态修复研究 1

1.2.1土地复垦与生态修复原则 1

1.2.2矿区土地复垦与生态修复的目标 2

1.2.3我国矿山复垦和生态修复存在的问题 2

1.2.4国外矿山复垦和生态修复研究 2

1.3 设计目的及设计任务 3

1.3.1 设计目的 3

1.3.2 设计任务 4

1.3 设计流程图 4

第二章 矿山复垦区环境 6

2.1 复垦矿区地理位置及地形地貌 6

2.2 气象条件 7

2.3矿体特征 7

2.4复垦区土壤及植被情况 8

2.5土地复垦 8

2.6社会经济状况 8

第三章 理论研究及可行性分析 9

3.1土地适宜性评价 9

3.2适宜性评价依据 9

3.3土地潜力评价 10

3.4土地评价理论 10

3.5 生态学理论 10

3.6评价单元划分 11

3.7评价方法选择 11

3.8矿山复垦标准体系 12

3.8.1复垦土地质量指标体系 12

3.8.2土地复垦质量控制指标体系 13

3.9可行性分析 13

第四章 设计过程 15

4.1 改良剂选择 15

4.1.1土壤肥力指标 15

4.1.2改良剂比较 16

4.2覆土厚度选择 19

4.3植被优选 20

4.3.1植被选择过程及依据 20

4.3.2 原植被调查 20

4.3.3植被选取 20

第五章 绿化施工技术及施工条件 22

5.1 各类施工技术简介 22

5.2 技术选择 22

5.3施工流程 24

5.4客土喷播种子配方 25

第六章 工程监测及工程预算 26

6.1工程监测 26

6.1.1复垦效益监测 26

6.1.2重建植被监测 26

6.2工程预算 26

6.3预期效果 27

第七章 总结与讨论 28

参考文献 29

致谢 31

附录:预期效果 32

第一章 绪论

1.1 设计背景与意义

土地资源是人类生存和发展的重要载体,是进行农业生产和工业建设的最基本的物质条件。土地自然条件的优良与人类合理的土地利用,产生了悠久和深远的人类文明,推动着人类社会的进步[1]。矿产资源是社会经济可持续发展的物质基础,我国70%以上的农业生产资料都来自矿产资源,95%以上的一次能源,80%以上的工业原料[2]。矿石采掘量仅次于俄罗斯和美国,成为世界第三大矿业国家。开采矿物给人类带来财富与便利,与此同时,也给所开采地区带来了一系列生态环境问题,这就对土壤复垦和生态恢复提出了更迫切的需求。

近些年来,采矿业和城市化的不断发展,占用了大量土地并且引发诸多环境和社会问题。据文献查阅,数据统计,中国耕地数量1996年为1.3亿公顷,2007年的为1.2亿公顷,这11年间每年减少的耕地总量为75.3万公顷。2012年和2013年全国耕地面积为20.27亿亩,即1.35亿公顷,2014年降至20.26亿亩,2015年为20.25亿亩,2016年为20.24亿亩,5年时间耕地面积总量减少23.75万公顷。按照有关规划纲要控制要求,到2020年,耕地保有量在1.2亿公顷。除此之外,矿区环境污染问题也在日益加剧,诸多污染事件甚至人员伤亡也时有发生,故土地复垦与生态重建是中国保障土地资源和保护环境的有效措施[3]

大冶铁矿矿区占地面积约16463.66亩,工业生产用地近90%,工业用地几乎全为山地,高低起伏较大。随着铁矿的开采,土地资源浪费和生态环境问题也接踵而至,为改善大冶铁矿山土地资源浪费、环境污染、废石堆堆积、植被稀少等问题,本设计通过查阅资料,在符合各项行业标准的基础下进行大冶某铁矿废石堆复垦设计。通过选择合适的土壤改良剂,合适的覆土厚度,优化复垦植被组合、覆土播种方式等,以期达到良好的环境与经济效益。